Archives

54 Bell Parkway Construction

2015 POH Winner

54 BELL PARKWAY: Parade of Homes 2015, First Place Winner of Division 4 Overall Interior Design & Workmanship.  Come view the beautiful craftsmanship and design on Saturday, June 20 or Sunday, June 21 form 1:00 pm until 6:00 pm. Hope to see you there!

 

 

 

54 Bell Parkway Completed

November 16, 2014:  This beautiful new home, featuring numerous upgrades, has been completed and is now move-in ready.  For a closer look, contact Beth Forrester at: 334.567-7978 or Beth@ForresterDeveloper.com

Use this link to check out the floor plan for 54 Bell Parkway, Wetumpka, Al 36092: The Brantly

54 Bell Parkway

JULY 14, 2014: Look at our progress… We are putting on the finishing touches. Outside, the new green sod is holding up well in the hot July sun.  The front steps are nice and wide, making them easy to maneuver. Inside, the cabinets and tile have been installed. This week we hope to have granite countertops installed. The interior colors are really turning out fantastic.  Come see this new design at Bell Ridge!

Use this link to check out the floor plan for 54 Bell Parkway, Wetumpka, Al 36092: The Brantly

APRIL 4, 2014: Not a good day for outside work.  Fortunately we were able to get the roof completed yesterday before rain moved in.

APRIL 3, 2014: Today was a great day to instal the architectural shingles on the roof.  We are now waiting on the energy efficient doors and windows to arrive. We expect them next Friday.  Check out what we are using at: AndersenWindows.com

MARCH 26, 2014: It’s a nice for working outside.  The house is really starting to take shape.

MARCH 13, 2014: It’s a cloudy morning, but we’re making progress. The framing process is well underway. We waited until March to start the framing because of the rainy weather.  Looking forward to spring.

MARCH 10, 2014: We have a new energy efficiency home under construction at 54 Bell Parkway located in the front-porch community of Bell Ridge in Wetumpka.  We will continue to post progress photos of the construction as we work to complete this one story 1,600 square foot heated and cooled home with 3 bedrooms 2 baths and a 2-car garage.

The foundation was poured right before the snow and ice storm in early February. It was perfect, with out doubt the best slab work I’ve seen in a while. The inspection showed clean footings and we passed with flying colors!